Why This Matters

When a new racking installation goes wrong, you pay twice. First, you lose efficiency. Your team wastes time navigating poorly designed layouts. Second, you lose compliance. Racking that doesn’t meet EN standards or SEMA guidelines puts your operation at risk.

We’ve seen it before. Warehouses built hastily, without proper site assessment, end up wasting space and creating safety hazards.

That doesn’t happen here.

Our New Installation Process

Site Survey & Assessment

We come to you for a comprehensive on-site assessment. We review your building, measure your space, understand your workflow, and identify what will actually work for your operation. No assumptions. No guesses.

CAD Design & Approval

You get full CAD drawings and an installation brief. We walk through the design with you before a single piece of racking arrives on site. Anything you want to change, we adjust. You approve before we proceed.

Professional Installation

Our installation teams are experienced, qualified, and work to schedule. Your racking goes in on time. Your operation keeps running. All work meets EN standards and SEMA guidelines.

Why Warehouses Choose Us

Efficient Design

A well-designed racking layout increases your usable storage space and cuts picking times. We design for your specific operation, not a one-size-fits-all approach.

Compliance Built In

All installations meet EN standards and SEMA guidelines. Your racking is safe, inspectable, and audit-ready. No surprises during compliance checks.

Stock From Top Manufacturers

Dexion, AR Racking, Link 51, Cornix, PSS. As official distributors, we can source the exact system you need at competitive rates. Fast delivery, flexible options.

You Keep Running

We schedule installations around your operation. Minimal downtime, maximum coordination. Your warehouse stays productive while we install.

What Our Customers Say

“The team were professional from start to finish. The CAD design was spot-on, and the installation went without a hitch. We were operational within 48 hours. Exactly what we needed.”

Warehouse Manager, Distribution Centre

40+ years installing racking systems

500+ successful installations across UK

Official distributors of Dexion & AR Racking

Common Questions

How long does the installation take?

Depends on the size of your installation. For a standard 2,000 sq ft system, expect 2-3 days. We’ll give you an exact timeline when we quote.

Do we need to shut down during installation?

Not necessarily. We work around your schedule and can install in phases if needed. We’ll discuss the best approach during the site survey.

What if we need to change the design?

That’s why you approve the CAD design first. Any changes before installation are straightforward. Changes after installation cost more, so we get it right upfront.

Are you EN and SEMA compliant?

Yes. All our work meets EN standards and SEMA guidelines. Full compliance documentation is provided with every installation.

My Quote (0)