The Rack Group name may have been born in 2002, but our work history, and love of all things racking, goes back to the 1980s...

> About Us > Our Story
We can dismantle and remove all unwanted racking equipment from customer sites.
Materials are removed from site with limited disruption to customer operations.
We inspect all materials, disposing of anything that is beyond repair in an environmentally friendly way.
An on-site assessment of existing racking layout is carried out.
A new layout proposal is supplied with CAD drawings.
Layouts are designed to utilise the space available as efficiently as possible.
We offer an initial on-site survey to assess whether the site can safely accommodate the proposed new storage systems.
A full CAD drawing is supplied alongside an installation brief for approval.
A quote is submitted upon design approval with a schedule of works.